Showing posts with label bikes on board. Show all posts
Showing posts with label bikes on board. Show all posts

09 March 2019

1 Bike Less = 1 Car Less

A packed bike car
(photo: Steve Wilhelm)
Bikes Onboard, an advocacy group for Caltrain's globally-unique system of carrying thousands of bicycles on board crowded rush hour trains, is lobbying for more bicycle storage space on Caltrain's new EMUs. The argument goes that creating more space for bikes encourages people to leave their car at home, resulting in a fast, convenient, low-carbon commute. They even have a tidy equation for it:
1 bike less = 1 car more
There's a slight problem with this equation. Storage for one bike takes up about the same space as one seat, so each biker occupies two spaces on board the train. Everything works out when there is spare capacity, but when a train gets full, the equation starts to break down.

The bikers argue that no regular passenger ever gets "bumped" off the train the way bikers do when the bike car is full, so the worst outcome of bringing a bike on a crowded rush hour train is that somebody else will need to stand rather than sit. How bad can that be?

Standing is uncomfortable, which invites the invisible hand of supply and demand. When the train ride at rush hour becomes uncomfortably crowded, passengers will sometimes stop riding. The level of peak crowding is self-regulating; there is an equilibrium level of unpleasantness where each new rider is balanced by another fed-up rider who quits due to crowding. This invisible hand works without a single passenger ever being "bumped" at boarding; the "bumping" in this case is happening at home when a person is deciding whether or not to ride the train that day. Unlike bicycle "bumps," you can't measure how much crowding discourages riders, and you can't count the number of people who won't ride out of concern for not being able to sit. That doesn't mean it's not happening.

In this case, a biker who no longer takes the train (and drives instead, let's say) will free up two spaces on the train (for former drivers, let's say). The correct equation for standing-room-only conditions is then:
1 bike less = 1 car less
This is why Caltrain should limit how much bike space is available on board the trains during rush hours. Any additional train cars ordered to increase the passenger carrying capacity of the new EMU fleet should be packed with seats and not a single additional bike space beyond the ones already provided. Peak hour bike commutes should be encouraged by improving station bike parking facilities, as is done in other countries where bike mode share is far higher than the Bay Area.

27 September 2018

Growing Caltrain into an 8-Lane Freeway

Caltrain can and should become an eight-lane freeway. Not like an ugly concrete scar tearing loudly through the landscape, but in terms of throughput capacity in people per hour. Today, Caltrain already carries the equivalent of nearly 3 freeway lanes, and more than doubling the system's capacity is hardly a moonshot. For perspective, BART's Transbay Tube carries up to 27000 people per hour, almost double the entire capacity of the Bay Bridge with its ten freeway lanes.

More than doubling Caltrain's capacity has been proposed before and is now being studied by the agency itself, after a decade of not thinking much past electrification.

Capacity calculations can be controversial and rely on many details and assumptions, so the suggested path to expand Caltrain ridership from 3 to 8 lanes of freeway-equivalent is provided in the form of a spreadsheet, embedded below. You can dig into all the numbers and assumptions for each capacity increase and see the underlying formulas for yourself, down to the detailed number of seats in each train car, to understand how it all adds up.

This is a living document, and feedback is appreciated!

20 September 2016

EMU Brochure

Credit: Stadler Rail Group
This week is InnoTrans 2016, the world's biggest rail industry trade show, held in Berlin, Germany. Stadler has a big presence there, and rolled out an updated website and downloadable brochures. Among them is a preliminary brochure for Caltrain's new KISS EMU, affording the first public glimpse into design details of Caltrain's new fleet.

Key Specs

The Stadler KISS (recently re-branded KISS160) as configured for Caltrain is a high-performance train that will have no issues sharing the corridor with high-speed rail.
  • Power: 6000 kW (8000+ hp)
  • Acceleration: 1 m/s2 from 540 kN (implying a loaded mass of 540 metric tons)
  • Braking: rated at 8000 kW, with most of the energy fed back into the electric grid
  • Vehicle width: 3 meters (comfortably inside US loading gauge)
  • Maximum speed: 110 mph
  • Straight sides, taking full advantage of US loading gauge, unlike European KISS
Train Layout

The six-car EMU shown in the brochure features dual boarding height doors throughout, to share platforms with high-speed rail and to enable Caltrain to transition gradually to gap-free level boarding, to cut down dwell times for the blended system.  The train consists of the following:


ParameterCar 1Car 2Car 3Car 4Car 5Car 6Total
Car typeCabMiddleMiddleMiddleMiddleCab-
Number of powered axles24040212
Seats, lower level3823638638149
Seats, upper level525260526052328
Seats, intermediate level10+21010+161010+1610+296
Seats, total102859210092102573
Bike spaces--40-40-80
Bathroom-1----1

As delivered, the upper level boarding doors are sealed and 5 seats are configured longitudinally in each vestibule on the intermediate level, accounting for 10 seats per car. These seats will be temporarily removed during the transition to level boarding with high platforms (when both sets of doors must be cleared of seats), diminishing seating capacity by roughly 10%. Once Caltrain achieves 100% level boarding, that seating can be restored on the lower level of each car.

The layout for all six cars can be viewed by zooming into the original PDF brochure, or more conveniently as individual graphics extracted below.


Accessibility

The seating diagrams reveal that the ADA bathroom displaces 15 seats.

Interestingly, the Stadler diagrams show two wheelchair spaces on the lower level of every car, which appears to imply that ADA wheelchair lifts would be provided in every car to cross between the lower and intermediate levels of each car.

Future Capacity

Caltrain's order from Stadler includes options for another 96 cars, which are planned to be exercised to expand the fleet to 24 trains and lengthen all trains to 8 cars or about 200 m long.

With the seating layout and train car dimensions defined, it is possible to predict the seating capacity of an 8-car train. The basic 6-car train already has all the traction equipment, so the two extra cars would likely be trailer cars similar to cars 3 and 5 above, except without the bike storage area on the lower level. Each of these extra cars would have 60 seats on the upper level, 46 seats on the lower level, and 26 seats on the intermediate level, for a total of 264 added seats. This would bring each train's ultimate capacity to 837 seats and 80 bikes, with plenty of additional space for standees.

19 October 2014

Level Boarding Plan B

Plan B: four doors per car.
Based on a photo by Yevgeny Gromov
What if the recent talk of platform compatibility was just a bunch of lip service, and the high-speed rail authority remained uncompromising on their requirement for platforms and train floors at a 51" (1295 mm) height above the rails?

Then we need to be prepared for Caltrain Level Boarding Plan B.

By definition, Plan B will never be as good as Plan A.  Plan A is a workable compromise solution that would enable a gradual transition to a fully compatible blended system where Caltrain and HSR can share the same station platform tracks with 100% level boarding.

Plan B is to join HSR in their choice of 51" platforms, however misguided it may be.  The transition to 51" platforms, from today's 8" platform height, seems at first a much more complicated problem.  But is it really?  What if you did this to Caltrain's new EMUs?


The train depicted here has two sets of doors, one pair for 51" platforms located on the mid level at the ends of each car, and another pair (quite similar to the Bombardier cars, with two steps up from an 8" platform) on the lower level.  This is only a minor tweak to Caltrain's plan, taking advantage of the vehicles to facilitate a gradual transition from today's 8" platforms to level boarding at 51".  During the transition to level boarding, only one set of doors opens at each stop, depending on the platform height at that stop.

Because it is a very specific solution, it's easy to shoot full of holes.  Plan B elicits a number of objections:

Extra doors take away seating space.  Additional vestibule areas will consume the space for at least 16 seats per car, or about 12% of train's overall seating capacity.  However, Caltrain already needs better standing areas to handle peak loads, and these vestibules could be a good way to comfortably accommodate standees.  The loss of seating could also be compensated by going five-abreast in extra-wide trains.

Extra doors will cause breakdowns.  While the overall reliability of a train certainly depends on how many doors it has, the failure rate of any given door is better measured in mean cycles between failures, rather than mean time between failures.  There is not a single additional door cycle since only one pair of doors opens at any given stop, so breakdowns and maintenance expenses will certainly not double.

Wheelchairs need the ability to change levels.  During the transition, when some platforms are at 8" and others at 51", wheelchairs may need to board and alight at two different heights.  A large ADA-compliant bathroom may also need to be placed in the roomy lower level.  This implies a requirement for a wheelchair lift inside at least one vehicle in the train.  It would be a packaging challenge, but is certainly not unprecedented.

Bicyclists need to navigate interior steps.  The large contiguous areas required for efficient bicycle storage (sorting bicycles by destination as is currently the practice) would most likely be located on the lower level.  When boarding and alighting at a 51" platform, bicyclists would need to negotiate 3 steps inside the train, possibly while it is moving.  This is certainly a challenge, but must be considered in the context of today's situation, where bicyclists have to maneuver inside a moving train to access a 40-bike storage area through a single 3-foot narrow entrance after climbing up four steep steps and turning the corner around a pole--sometimes in the middle of a Giants game crowd.  Providing stair gutters in the bicycle car steps (which, by the way, would be longitudinal steps that could be built far less steep than those transverse gallery car steps) could make interior navigation far easier than it is today.

Extra doors will make the trains more expensive.  There is no question that this extra complication will lead to extra expense, but the key question is how much?  The extra pair of doors will be responsible for perhaps an extra 5% capital cost.  On a half-billion-dollar fleet purchase, this amounts to $25 million, an amount that sounds enormous to anyone with a mortgage.  But $25 million is a pittance in the context of the thousands of millions (billions!) required to build separate station infrastructure for Caltrain and HSR.  The extra cost is a rounding error, and a good case can be made for HSR picking up the compatibility tab.

Trains are difficult to build with that many doors.  Structurally speaking, each door opening compromises the strength of the car body structure, reducing its ability to withstand the enormous loads during a train wreck.  The crashworthiness of rail cars is highly regulated by the FRA, and achieving compliance for a four-door car could be quite an engineering challenge.  This is a question best left for car builders to answer.

So yes, admittedly, Plan B is sub-optimal for a number of reasons as described above.  It is quite controversial even among Caltrain advocates, many of whom harbor a visceral dislike of 51" platforms.  This dislike goes so far as to lead them to a very strange advocacy position: that Caltrain and HSR should have separate platforms!

As we have often discussed, separate platforms are an operational disaster waiting to happen at San Francisco Transbay, since every inbound Caltrain movement will conflict with every outbound HSR movement.  This constraint will  limit the capacity and future growth of the blended system.  And it's not just a Transbay issue: separate HSR stations at Millbrae, the mid-peninsula, and San Jose will require billions of additional infrastructure spending that would not otherwise be necessary.  Is that a better outcome than Plan B?

The Best of the Rest

Supposing Plan A fails and HSR insists on 51" platforms, then Plan B is the best of the rest.  It is a simple plan, and a reasonable solution for not precluding common platforms in the future.  Anyone who takes issue with it owes a detailed description of their own specific plan to make Caltrain and HSR more compatible.