13 November 2008

Quickie Stakeholder Analysis


Each stakeholder in California's HSR project has different interests in the project. Keeping those interests in mind is very important to interpret their actions. On the back of an envelope, the stakeholders are:

The Public

The public has a strong interest in the HSR project, rooted in two different roles: the role of a user who desires HSR to be convenient and fast, and the role of a taxpayer who desires HSR to be built efficiently and for the least amount of money. The public pays up front (see Proposition 1A) and is usually not very well organized to defend its collective interests, compared to the other stakeholders. This blog will scream loudly, if anybody listens, to defend those interests.

While other stakeholders may say that they want HSR to be fast and cheap, the bottom line is that they have little stake in that outcome. Read on to see why!

The Agencies and Governments

On the peninsula, the various agencies are going to defend their parochial interests. Caltrain, the Transbay Authority, SamTrans, VTA, the three counties, the High Speed Rail Authority, and the local communities are going to defend their piece of the pie, be it money or influence. One catfight to watch for in the coming years will pit Caltrain against the CHSRA. Caltrain owns the peninsula rails, but HSR will so profoundly alter every project recently undertaken or planned by Caltrain that even shared goals (fast, efficient and modern transportation) won't be enough to prevent some friction. Up in San Francisco, sparks are already starting to fly between the CHSRA and the Transbay Authority.

The agencies will be in cahoots with the construction companies. You've got to worry when on the night of the election, Quentin Kopp, the head of the CHSRA, is having martinis with the construction big wigs (HNTB, Parsons Brinckerhoff, Webcor) who will get a piece of the action.

The Construction Companies

Construction companies that will build the HSR project stand to profit handsomely. They are where the money ultimately flows. Design engineering, construction, program management, most of the slices of the HSR budget will be sent to them at some point. Their interest is to make money. They make a lot of money by engineering complex infrastructure that involves lots of earth moving and concrete pouring. The more earth moving and concrete pouring, the greater the profit. There's nothing wrong with that so far.

Unfortunately, those same companies are also in charge of designing all this infrastructure. The fox is guarding the hen house, but in proper industry lingo this is passed off as cost-saving "design-build-operate-maintain" and "turn-key solutions". The construction companies know that once HSR is far enough along, nothing will stop its completion, least of all running out of money. They have little interest in making HSR any faster or better or cheaper than absolutely necessary to maintain continued public funding of the project. The wisdom goes that among the three qualities, faster, better and cheaper, you can have any two. Locally, if the HSR design is left without strong oversight, the peninsula may get none of the three.

Look out for gold-plated solutions to simple problems, sold by throwing up a fog of expert-knows-best complexity.

The Neighbors

Many communities, groups and individuals on the peninsula will suffer negative impacts from the HSR project, either inherent in its design or arising from its construction. These groups have some of the most obvious and clear-cut interests: Not In My Back Yard! They will work hard to influence HSR plans to their own benefit, with less regard for the wider public interest. One example: the resolutions opposing Proposition 1A passed by the city councils of Menlo Park and Atherton. Yet another example is Millbrae's push to develop land needed for HSR. And that's only the beginning...

Opposite the NIMBY's, there are what you might call YIMBY's (Yes, In My Back Yard!) who would like to use HSR as an opportunity to obtain local benefits, again without regard to the wider public interest. One example is the screwball plan to tunnel the tracks underground, floated by a Palo Alto group. There will be other communities keenly interested in swinging some HSR bacon their way to achieve urban design aspirations entirely unrelated to HSR.

Let's finish on a positive note: to avoid becoming the boondoggle that proposition 1A opponents fear, the HSR project needs to be designed under the watchful eye of an independent panel of experts with local knowledge, and especially some TEETH to bite back at the agencies and contractors as required to keep them attuned to the public interest. Whether the provisions attached to Proposition 1A will provide for this remains to be seen.

09 November 2008

The Big Picture

To people who live on the San Francisco peninsula, High Speed Rail will be defined by four principal characteristics:
  • 4 tracks all the way, from San Jose to San Francisco
  • Full grade separation, i.e. no grade crossings
  • 125 - 150 mph top speed (far lower than the 220 mph capability of HSR)
  • Electrification with a 25,000 volt overhead contact system
According to Quentin Kopp, chairman of the California High Speed Rail Authority, the peninsula line could be operational in 2015.

What will that look like where you live?

We can try to draw the big picture from the CHSRA's Environmental Impact (EIR/EIS) documents for the Bay Area, published in May 2008. There's lots of detail in the report and appendices.

A map of the peninsula from a 2004 EIR/EIS document (at right) summarizes where the peninsula tracks are planned to run at-grade, in tunnels, or in elevated or sunken sections. The CHSRA also provides a more recent, interactive Google Map. These maps are clearly preliminary, as anyone with detailed local knowledge will attest; they will be fleshed out in the next few years during the detailed engineering phase.

HSR plans call for building most of the new peninsula tracks at ground level, or in elevated / sunken sections as labeled in the above map. Cross sections of these configurations are provided, with the most common shown below.



Ground level 4-track section. Caltrain already has these (minus the overhead wires) in Brisbane, Redwood City and Sunnyvale, to enable Baby Bullet service. The ROW width is about 100 feet, including service access roads used mostly for trimming vegetation. This configuration is labeled A.38 in the map above.

Elevated 4-track section. Where space is available, this can be built on a wide berm. Where space is not available, retaining walls are used as shown in the figure, keeping ROW width to within 75 feet (with external access presumed). Labeled A.39 in the map above.

Sunken 4-track section. The ROW width is within 75 feet (with external access presumed). Labeled A.39 in the map above.

Caltrain has some additional dimensioned cross section drawings in Chapter 2 of their electrification EA/DEIR (see in particular Figure 2.3-3).

At any location, the choice of configuration will depend on a variety of factors:
  • Grade separations, where the height of the tracks is constrained by the presence of an under- or overpass
  • Available right-of-way width: some configurations consume more space than others, with possible eminent domain impact
  • Noise and aesthetics (sunken is preferable on both counts)
  • Expense: anything involving lots of earth moving and pouring of concrete will automatically cost lots of money. That is certainly bad for the taxpayer, although the large construction firms that design these projects sure don't seem to mind.
How will the arrival of HSR alter existing Caltrain tracks, stations and crossings? In future posts, this blog will focus on some unique situations at various locations on the peninsula.

Money Matters


The California High Speed Rail Authority released their 2008 Business Plan, giving a basic overview of the expected capital costs of upgrading the peninsula right of way to accommodate HSR and Caltrain. Construction costs are broken down on page 23. The 50-mile segment from San Francisco to San Jose is expected to cost $4.2 billion to reconstruct (plus 8% program management overhead), or $84.2 million per mile. This amounts to nearly 13% of the cost of the entire SF - Anaheim HSR project. All figures in 2008 dollars.

It is not clear how much funding the CHSRA assumes will come from Caltrain's long-planned electrification project, or how HSR will be integrated with Caltrain electrification. Caltrain's latest cost estimates amount to nearly $1.5 billion to electrify the existing tracks, without regard to HSR compatibility. This includes $785 million for electrification infrastructure, $231 million for signal and crossing improvements, $422 million for new trains, and $100 million overhead for managing the project. That all comes to $20 million per mile in construction costs.

It is also unclear how much funding the CHSRA assumes will come from San Francisco's new Transbay Transit Center. This $4.2 billion project (year of expenditure) was planned independently of HSR, although it dovetails nicely with HSR. It includes a 1.3 mile extension of the tracks beyond Caltrain's current 4th & King terminal to the new Transbay Terminal in the heart of the financial district. Construction is slated to begin in 2012, with the downtown extension opening in 2018.

That's a lot of money, so I have to wonder, do all these agencies expect each other to pay for various costs?

01 November 2008

About This Blog

Welcome to the Caltrain - High Speed Rail Compatibility Blog. (what a mouthful, huh.)  The purpose of this blog is to discuss how the California High Speed Rail project will be integrated with Caltrain on the peninsula corridor between San Francisco and San Jose. We often hear that high speed rail (HSR) must be "done right." That sentiment is easy to agree with, until one tries to define what "right" actually is: different stakeholders have vastly different ideas about this.

This blog exists to educate and enlighten the discussion about high speed rail on the peninsula, so that people on all sides of the debate can argue from a position of knowledge. California taxpayers are footing the bill for this megaproject, and it's only appropriate that they be given enough information to intelligently judge the designs that the civil engineering firms are going to come up with. The California High Speed Rail Authority (CHSRA) and its engineering consultants are pursuing an "outreach program," but one can't expect that this program will meet much more than the minimum standards required by federal (NEPA) and California (CEQA) environmental protection laws. In theory, the CHSRA is accountable to the people, but if the people aren't knowledgeable about what is being done, there is no basis upon which to react and hold the agency accountable.

We need information, and a convenient place to discuss it: right here on this blog.

Editorial Stance

This blog generally supports high speed rail on the peninsula. There are a few underlying editorial assumptions that readers should know about.
  • This blog accepts that HSR is a worthy investment. While we will often discuss details of how money is invested, and whether it is being wasted, the fundamental question of whether or not to build high speed rail is not a topic of this blog. For that sort of stuff, please visit the California High Speed Rail Blog and its extensive archive.
  • This blog accepts that HSR will run between San Jose and San Francisco on the Caltrain corridor, as a result of the Pacheco Pass alignment selection.  For many reasons, this alignment selection was likely not the best one, and an Altamont alignment would have been superior even in the narrow context of peninsula rail operations.  The Pacheco vs. Altamont routing continues to be one of the hot-button issues of the HSR debate, and discussion of it is welcome so long as it stays relevant to the peninsula.
  • This blog will often get technical. The nerdy train stuff is actually important in allowing peninsula residents to understand what is and isn't possible. We will try to make such technical topics as accessible as we can. Don't hesitate to use the comment section to ask questions.
  • This blog is tolerant to all view points, including those of so-called NIMBY (not in my back yard) opponents of the project. Everyone of every ideological persuasion benefits from the free and respectful exchange of ideas. Offensive, disrespectful or way-off-topic comments may be deleted at the discretion of the blog administrator.
Blog Inputs

Several people contribute material to this blog and expand its breadth and quality. All of them do so on a volunteer basis, and they are given credit where it is due, in each blog post.

Anonymous tips or contributions are welcomed. You may either post anonymously in the comment section, or contact me directly at clem (at) tillier (dot) net. Anonymity and confidentiality are guaranteed upon request. If preferred, I can meet with you in person.

About the Author

My name is Clem Tillier. I am an interested citizen, taxpayer, and potential user of high speed rail. I am a peninsula resident and frequent Caltrain user. Although I am an engineer with a life-long interest in trains, especially of the high speed variety, I do not work in the rail transport industry. I have no relationship with the CHSRA or any of its engineering consultants, whether personal, professional or financial. I think and write about this topic in my spare time, which explains the occasional hiatus.