Preliminary rendering of new Hillsdale station with island platform |
Vertical circulation to this island platform is provided at the north end (two stairways connecting to the sidewalks on each side of the new 28th Ave underpass) and the south end of the station (a new pedestrian tunnel with one stairway and one wheelchair ramp). In cross section, the new Hillsdale might look like this:
Of course, the accelerated schedule for its completion is closely linked to electrification, so quite soon thereafter it might look like this, with mixed diesel and EMU service. Note that per Caltrain plans, the overhead contact system is 22 feet above the rails. plenty to clear even the tallest freight cars.
It's not too difficult to guess what happens when the blended system overtake tracks are built: the new platform and all associated vertical circulation (stairs and ramp) will be demolished, to be replaced by a pair of new express tracks right down the middle of the corridor. A first phase of this "New New Hillsdale" station would like this, hopefully with level boarding platforms. Note the new portal configuration of the overhead electrification, to span across four tracks and two platforms without placing poles close to the edge of the new platforms:
After demolition of the "New Hillsdale" island platform, the original 48-foot track centers allow for two additional overtake tracks and a central fence (track spacing 15 + 18 + 15 feet) to prevent passengers from crossing between the two new side platforms of the "New New Hillsdale." Including stairs, the "New New" station is 106 feet wide and looks as much as possible like any station on Amtrak's Northeast Corridor. It could almost be mistaken for Princeton Junction:
While it's a fine idea to build the new grade separation sufficiently wide for four tracks, demolishing the "New Hillsdale" station only to replace it so soon with a "New New Hillsdale" seems terribly wasteful. Perhaps this is another case of "why build it right when you can build it twice?" Surely there is a better way.
Rebuilding Hillsdale Once and for All
There's a much better way to build the New Hillsdale once and for all. It initially looks like this:
Note the central island platform is a full-height level boarding platform, disguised for now as an 8-inch platform by raising the track bed by 51 - 8 = 43 inches using a thicker-than-usual layer of ballast. The final footprint of this station, which will ultimately have the HSR overtake tracks on the outside, is less than 100 feet wide at the platform. The footprint will never change; all the concrete has been poured and not another cubic yard is needed in the future. Soon after electrification, mixed EMU and diesel service would look like this:
The overhead contact system is built in its final configuration 22 feet above the eventual height of the tracks; because the tracks are raised by 43 inches, the vertical clearance is temporarily reduced to 18' 5" which still safely accommodates Plate F freight cars, the tallest that have historically been used in this part of the corridor. Therefore, there is no constraint to freight service. This electrification will never change, with all the portals in their final configuration.
When all the diesels are gone and it's time to transition to level boarding, a track maintenance project takes place over a weekend. 43 inches of ballast are removed from under the tracks, using standard track maintenance machines. The rails are never even disconnected. (Not to be too flippant, this is still a major track maintenance operation that would require sophisticated planning and modern high-capacity machinery; but it is certainly within the realm of what Caltrain has done before.) Minor lateral adjustments are made to track and overhead contact system alignment, yielding this for the Monday morning rush:
Not a single cubic yard of concrete is required either to convert to level boarding, or to add the overtake tracks once HSR service begins on the peninsula. The final blended system configuration is ultimately this:
Built once, and built right!
That FSSF Thing
Placing the express overtake tracks on the outside, in a fast-slow-slow-fast or FSSF configuration, as opposed to the traditional slow-fast-fast-slow or SFFS configuration inspired by road design, is a key architectural decision for the blended system. The forces of traditionalism will argue strongly for SFFS because that's how it's "always" done, yielding nice straight express tracks down the middle of the corridor-- but clear exceptions to this "rule" exist, with examples of FSSF corridors in these videos from Sweden (with 125 mph express trains!) and Australia.
The fatal operational flaw of traditional SFFS corridors is that when a track must be taken out of service, either accidentally or intentionally for maintenance, commuter trains either must cut across the express tracks (fouling express traffic) to reach the opposite platform, or use super awkward bridge plates to board from the fouled express track. In contrast, an FSSF island platform is operationally flexible: the train simply crosses over to the opposite side of the island, without ever getting in the way of express traffic. For the peninsula "blended system" where Caltrain and HSR share the corridor, the operational headaches of SFFS could prove unworkable in the long run as the rail corridor is maintained.
One argument systematically trotted out against FSSF is this: wowing express trains around the outside of every island platform will make for a slalom "barf ride" that will give HSR passengers motion sickness, if not downright whiplash. This argument intuitively rings true, but turns out to be patently false when you run the numbers. In reality, an express train blasting around the Hillsdale island platform at 125 mph will do so on curves with a radius greater than four miles, requiring just 2 inches of superelevation to be rendered imperceptible to passengers.
Download FSSF island platform plans for every station on the Caltrain corridor (3.3 MB PDF, see page 9 for Hillsdale) |
The Takeaways
- DON'T rebuilt infrastructure multiple times.
- DO build it once and build it right, in its final configuration
- DON'T build station platforms that are not compatible with level boarding, where this can be avoided.
- DO create the Caltrain engineering standards for level boarding.
- DO build the new Hillsdale station with a level boarding platform, years before the transition to level boarding occurs, by temporarily raising the track bed to make the platform only 8" tall.
- DO build the new Hillsdale station as an island platform, even after high-speed overtake tracks are added
- DO put the high speed tracks on the outside, in the FSSF configuration, for operational flexibility.